
New Manufacturing Large Capacity Series Type AC Hv Testing Transformer
2) Please discharge the sample object if the sample object is a capacitive equipment.
Product Introduction
We are working together to continue to create the great Lead Acid Battery Tester, 6 phase relay tester, surge arrester testing and to keep the company's growth and profitability strong and sustainable in the future. In order to meet the needs of customers, we also have a large warehouse to realize zero inventory management for the enterprise and complete after-sales service. We strive to improve the quality of products, reduce costs, and provide the best service for the society with quality and cheap products. Our company's price is reasonable, the service is thoughtful, the quality is first-class, the prestige is outstanding. It is the mission and dream of every one of our employees to revitalize the national industry, make our company stronger and bigger, and realize the great rejuvenation of the Chinese nation!
HZQ AC Hipot SF6 Gas Inflated Type Power Frequency Testing Transformer

Technical parameters of HZQ series alternating current test transformers
Model | Capacity (KVA) | High Frequency Voltage | High Frequency | Low Frequency Voltage input | |
V | A | ||||
HZQ-1.5 | 1.5 | 50 | 30 | 200 | 7.5 |
HZQ -3 | 3 | 50 | 60 | 200 | 15 |
HZQ -5 | 5 | 50 | 100 | 200 | 25 |
HZQ -10 | 10 | 50 | 200 | 230/400 | 50/26 |
HZQ -20 | 20 | 50 | 400 | 380 | 53 |
HZQ-30 | 30 | 50 | 600 | 380 | 79 |
HZQ -40 | 40 | 50 | 800 | 380 | 105 |
HZQ -50 | 50 | 50 | 1000 | 380 | 132 |
HZQ-5 | 5 | 100 | 50 | 200 | 25 |
HZQ -10 | 10 | 100 | 100 | 200/380 | 50/26 |
HZQ -20 | 20 | 100 | 200 | 380 | 53 |
HZQ -30 | 30 | 100 | 300 | 380 | 79 |
HZQ-40 | 40 | 10 | 400 | 380 | 105 |
HZQ-50 | 50 | 100 | 500 | 380 | 132 |
HZQ-100 | 100 | 100 | 100 | 500 | 263 |
HZQ-150 | 150 | 100 | 1500 | 500 | 300 |
HZQ-200 | 200 | 100 | 2000 | 500 | 400 |
HZQ-250 | 250 | 100 | 2500 | 380 | 500 |
HZQ-20 | 20 | 150 | 133 | 380 | 53 |
HZQ-30 | 30 | 150 | 200 | 380 | 79 |
HZQ-50 | 50 | 150 | 333 | 380 | 132 |
HZQ-100 | 100 | 150 | 666 | 500 | 263 |
HZQ-150 | 150 | 150 | 1000 | 500 | 300 |
HZQ-200 | 200 | 150 | 1333 | 500 | 400 |
HZQ-250 | 250 | 150 | 1666 | 380 | 500 |
HZQ-30 | 30 | 200 | 150 | 380 | 79 |
HZQ-50 | 50 | 200 | 250 | 380 | 132 |
HZQ-100 | 100 | 200 | 500 | 380 | 263 |
HZQ-150 | 150 | 200 | 750 | 500 | 300 |
HZQ-200 | 200 | 200 | 1000 | 500 | 400 |
HZQ-250 | 250 | 200 | 1250 | 500 | 500 |
HZQ-30 | 30 | 250 | 120 | 380 | 79 |
HZQ-50 | 50 | 250 | 200 | 380 | 132 |
HZQ-100 | 100 | 250 | 400 | 380 | 263 |
HZQ-150 | 150 | 250 | 600 | 500 | 300 |
HZQ-200 | 200 | 250 | 800 | 500 | 400 |
HZQ-250 | 250 | 250 | 1000 | 500 | 500 |
The operation of the insulation test with HIPOT tester is as follows:
1) Please make grounding connection for sample object, HV transformer and main control box first
2) Please discharge the sample object if the sample object is a capacitive equipment.
3) Please make connection for tester and sample object according to figure 3.
4) Please make power connection for main control box.
5) Confirm the high voltage value in withstand.
6) Setting the protection value of current by the pointer on the over current protection relay panel.
7) Adjust the regulator to zero position and then press down the close button on the panel the tester with enable the high voltage output unit.
8) If the regulator is not at zero position when you press down the close button the high voltage output unit would not be enabled.
There is a zero position indicator light on the panel of the main control box.
9) Adjust the high voltage output to the withstand test value step by step. Read the high voltage value and LV current from meters at the same time.
10) Start the timer by the timer switcher on the main control box panel when the high voltage has.
11) If the current over the value set on the panel of the over current relay the tester would cut off the power supply of HV transformer immediately. It is said the test result is failure.
12) If the timer display value reach the set value the tester would have a sound alarm to inform operator that the withstand time is ok. If the tester has not start the over current protection unit before sound alarm it is said the test result is ok.
13) Open the power supply of HV transformer by press down the "open" button on the panel of the main control box when test is end.
14) Please discharge the high voltage circuit of sample equipment before remove off the cable connection of high voltage circuit.
Please do not start the test if some part of the tester had been destroyed.







Based on the global market, we win the trust of our customers with high quality New Manufacturing Large Capacity Series Type AC Hv Testing Transformer and enthusiastic services, continuously improve customer satisfaction, and be a close partner of our customers. It is not just about selling products, but about building long-term relationships with our customers, and to build such relationships, trustworthiness is the most important characteristic. We need to continuously improve our design capabilities and the overall quality of employees to meet customers' needs for product quality and service.
Hot Tags: HZQ SF6 Inflated Type Electrical Testing Transformer, China, suppliers, manufacturers, price, for sale, Inflated Type High Potential Testing Transformer, Inflatable High Voltage Testing Transformer, AC DC Testing Transformer, SF6 Gas Insulated Inflatable Testing Transformer, HZQ, Cable testing transformer 3 kva, transformer oil acid value tester, petroleum test instruments, wireless phase detector, astm d86 distillation tester, distribution transformer test bench, power quality analyzer with data logger
[[ProKeywords]]SPEC DATA
Send Inquiry
