
AC Sf6 Inflatable Type Testing Transformer for Type and Routine Test
2) Please discharge the sample object if the sample object is a capacitive equipment.
Product Introduction
Our vision is to lead the development of 3 phase relay test set, hv phasing detector, power quality analyser manufacturing industry, repay shareholders and contribute to the society with outstanding performance. We continue to improve the level of fine, detailed and real safety and environmental management, and comprehensively promote the construction of a dual prevention mechanism for safety risk classification and control and hidden danger investigation and treatment. The excellent corporate culture, advancing design concepts, lean quality and perfect service system have established our position in the industry. We insist on promoting socialist core values, caring for employees and attaching importance to relationship management with partners. With the joint efforts of all employees, we are advancing towards the goal of building an industry-leading enterprise with high quality development in the new era.
HZQ AC Hipot SF6 Gas Inflated Type Power Frequency Testing Transformer

Technical parameters of HZQ series alternating current test transformers
Model | Capacity (KVA) | High Frequency Voltage | High Frequency | Low Frequency Voltage input | |
V | A | ||||
HZQ-1.5 | 1.5 | 50 | 30 | 200 | 7.5 |
HZQ -3 | 3 | 50 | 60 | 200 | 15 |
HZQ -5 | 5 | 50 | 100 | 200 | 25 |
HZQ -10 | 10 | 50 | 200 | 230/400 | 50/26 |
HZQ -20 | 20 | 50 | 400 | 380 | 53 |
HZQ-30 | 30 | 50 | 600 | 380 | 79 |
HZQ -40 | 40 | 50 | 800 | 380 | 105 |
HZQ -50 | 50 | 50 | 1000 | 380 | 132 |
HZQ-5 | 5 | 100 | 50 | 200 | 25 |
HZQ -10 | 10 | 100 | 100 | 200/380 | 50/26 |
HZQ -20 | 20 | 100 | 200 | 380 | 53 |
HZQ -30 | 30 | 100 | 300 | 380 | 79 |
HZQ-40 | 40 | 10 | 400 | 380 | 105 |
HZQ-50 | 50 | 100 | 500 | 380 | 132 |
HZQ-100 | 100 | 100 | 100 | 500 | 263 |
HZQ-150 | 150 | 100 | 1500 | 500 | 300 |
HZQ-200 | 200 | 100 | 2000 | 500 | 400 |
HZQ-250 | 250 | 100 | 2500 | 380 | 500 |
HZQ-20 | 20 | 150 | 133 | 380 | 53 |
HZQ-30 | 30 | 150 | 200 | 380 | 79 |
HZQ-50 | 50 | 150 | 333 | 380 | 132 |
HZQ-100 | 100 | 150 | 666 | 500 | 263 |
HZQ-150 | 150 | 150 | 1000 | 500 | 300 |
HZQ-200 | 200 | 150 | 1333 | 500 | 400 |
HZQ-250 | 250 | 150 | 1666 | 380 | 500 |
HZQ-30 | 30 | 200 | 150 | 380 | 79 |
HZQ-50 | 50 | 200 | 250 | 380 | 132 |
HZQ-100 | 100 | 200 | 500 | 380 | 263 |
HZQ-150 | 150 | 200 | 750 | 500 | 300 |
HZQ-200 | 200 | 200 | 1000 | 500 | 400 |
HZQ-250 | 250 | 200 | 1250 | 500 | 500 |
HZQ-30 | 30 | 250 | 120 | 380 | 79 |
HZQ-50 | 50 | 250 | 200 | 380 | 132 |
HZQ-100 | 100 | 250 | 400 | 380 | 263 |
HZQ-150 | 150 | 250 | 600 | 500 | 300 |
HZQ-200 | 200 | 250 | 800 | 500 | 400 |
HZQ-250 | 250 | 250 | 1000 | 500 | 500 |
The operation of the insulation test with HIPOT tester is as follows:
1) Please make grounding connection for sample object, HV transformer and main control box first
2) Please discharge the sample object if the sample object is a capacitive equipment.
3) Please make connection for tester and sample object according to figure 3.
4) Please make power connection for main control box.
5) Confirm the high voltage value in withstand.
6) Setting the protection value of current by the pointer on the over current protection relay panel.
7) Adjust the regulator to zero position and then press down the close button on the panel the tester with enable the high voltage output unit.
8) If the regulator is not at zero position when you press down the close button the high voltage output unit would not be enabled.
There is a zero position indicator light on the panel of the main control box.
9) Adjust the high voltage output to the withstand test value step by step. Read the high voltage value and LV current from meters at the same time.
10) Start the timer by the timer switcher on the main control box panel when the high voltage has.
11) If the current over the value set on the panel of the over current relay the tester would cut off the power supply of HV transformer immediately. It is said the test result is failure.
12) If the timer display value reach the set value the tester would have a sound alarm to inform operator that the withstand time is ok. If the tester has not start the over current protection unit before sound alarm it is said the test result is ok.
13) Open the power supply of HV transformer by press down the "open" button on the panel of the main control box when test is end.
14) Please discharge the high voltage circuit of sample equipment before remove off the cable connection of high voltage circuit.
Please do not start the test if some part of the tester had been destroyed.







We strive to increase productivity and improve the quality of AC Sf6 Inflatable Type Testing Transformer for Type and Routine Test while maintaining production standards. Internally, we establish key management systems in steps to lay the foundation for building an international business platform and achieving rapid, high-quality business development in the medium to long term. By interacting with our customers, we turn buying and selling into cooperation and elevate business into strategic complementarity.
Hot Tags: HZQ SF6 Inflated Type Electrical Testing Transformer, China, suppliers, manufacturers, price, for sale, Inflated Type High Potential Testing Transformer, Inflatable High Voltage Testing Transformer, AC DC Testing Transformer, SF6 Gas Insulated Inflatable Testing Transformer, HZQ, Cable testing transformer 3 kva, series resonance test equipment, partial discharge detection system, DC Hipot Test Set, capacitive voltage divider, 120kv 5ma dc hipot tester, on load tap changer tester
[[ProKeywords]]SPEC DATA
Send Inquiry
