HZSF-702 High Precision SF6 Gas Dew Point Tester

Technical Characteristics And Parameters
|
Features |
||
|
Smart calibration |
The sensor probe can automatically calibrate the zero point to ensure the readiness for each measurement; |
|
|
Quick and gas-saving |
After turning on the machine and entering the measurement state, the dew point measurement time for each SF6 air barrier is about 5 minutes; |
|
|
Safe and reliable |
It adopts self-locking joints imported from Germany, which are safe, reliable and airtight; |
|
|
Mass storage |
Adopting a large-capacity data storage design, it can store up to 250 sets of test data; |
|
|
High definition display |
Color screen directly display dew point, moisture, temperature, humidity, time, date and dew point curve; |
|
|
Moving measurement |
Built-in large capacity rechargeable lithium battery, a full charge can work for 10 hours; |
|
|
Accurate measurement |
The temperature compensation function is added to ensure the accuracy of the measurement results under various temperature conditions. |
|
|
Local calibration |
This machine comes with calibration function, do not need to connect the computer to complete the data calibration. |
|
|
Technical parameter |
||
|
dew-point |
Measuring range |
-60℃~+ 20℃ |
|
measurement accuracy |
±1℃ |
|
|
ambient temperature |
-40℃~+80℃ |
|
|
environment humidity |
0~100% RH |
|
|
Display device |
4.3-inch color touch screen |
|
|
power supply |
AC 220V;Built-in rechargeable battery: can be used for more than 10 hours on a single charge |
|
|
weight |
4.5Kg |
|
|
size |
300 mm×150 mm×300mm |
|
|
Operating temperature |
-30℃~+60℃ |
|
Measurement Methods
1,Connect SF6 devices
Connect the threaded end of the measuring pipe to the switch joint, tighten it with a wrench, and close the needle valve at the other end of the measuring pipe; insert one end of the quick connector on the measuring pipe into the air inlet of the instrument; insert one end of the exhaust pipe The exhaust port on the back of the instrument, and put the other end into a trench or window. Finally, connect the switch connector to the SF6 electrical equipment measurement interface and tighten with a wrench;
2,initialization
Turn on the power switch of the instrument, and the instrument will enter the initialization self-calibration process. After the calibration, it will automatically enter the measurement page.
3,Check battery
It is recommended to use DC power first for this instrument. When using DC power, please check the battery power displayed in the upper right corner. If the power indicator turns red, please turn off the phone and charge before continuing to use it.
4,Start measuring
Fully open the flow valve on the front panel of the dew point meter, and then slowly adjust the flow to about 0.5L/M by adjusting the needle valve on the measurement pipe to start measuring the SF6 dew point. The first device takes 5 to 10 minutes to measure, and each subsequent device takes 3 to 5 minutes.
5,Storing data
After the measurement is completed, the data can be saved in the instrument and press the "OK" key to bring up the operation menu. See the next section for specific operation methods.
6,Measure other equipment
After the measurement of a piece of equipment is completed, close the needle valve on the measuring pipe. Remove the switch connector together with the measuring pipe from the SF6 electrical device. If you need to continue measuring other devices, please do not turn off the instrument power and follow the steps above to continue measuring the next device.
7,Measurement ended
After all equipment measurements are completed, turn off the instrument power.