Safety precautions for wireless high-voltage phasing stick

Jan 28, 2024

The safety precautions for wireless high-voltage phasing sticks are as follows:

1. During on-site testing, operators should follow the safety distance standards for high-voltage testing by the power department.

2. The standard configuration is an insulated pole of 3.1 meters, corresponding to a voltage level of ≤ 220KV. If the measured line voltage is higher than 35KV, please use an insulated pole with a length greater than 3.1 meters. Insulation rods should undergo corresponding withstand voltage tests before use.

3. During nuclear phase operation, do not hold the hand beyond the position of the insulated rod handle.