
Transformer on-Load Tap Changer Oltc Diagnosis Testing Equipment
Product Introduction
We will continue to explore innovation, product updates, depending on customer demand for their own responsibility, carefully designed to provide reliable and high-quality 6 phase relay tester, ultra low frequency tester, high voltage circuit breaker tester. The company adheres to the business philosophy of focusing on production, focusing on talents, surviving on quality, and developing on credibility, and provides one-stop production and sales services. In the growth process of our company, talents have laid a solid foundation for our company to become a pioneer in the industry. We take scientific and standardized management, high-quality and efficient service as the concept, and adapt to the market competition as the guide.
HZYA-2Z Digital Transformer On Load Switch Tap-Changer Analyzer
I.Description
The on-load tap-changer is the only moving part connected to the transformer circuit. Therefore, its detection has become increasingly important. According to the "Power Equipment Transfer and Preventive Test Procedures," it is required to check the on-load tap-changer action sequence and measure the switching time.
This instrument is primarily used to measure the transition waveform, transition time, instantaneous transition resistance, and three-phase synchronization of the transformer on-load tap-changer.
The instrument features a high degree of intelligence, with all-English menu prompts for simple operation. It is compact, lightweight, and offers strong anti-interference capability, significantly reducing the labor intensity of field personnel. It is an ideal instrument for ensuring safe production and improving product quality in power supply units and transformer manufacturing industries.
II.Technical Parameters
Output current: 1.0A, 0.5A 0.2A
Measuring range Transition resistance: 2Ω~20Ω(1.0A) 5Ω~40Ω(0.5A)
20Ω~100Ω(0.2A)
Transition time: 0 ~ 320ms
Open circuit voltage: 24V
Measurement accuracy Transition resistance: ± (5% reading ± 0.1Ω)
Transition time: ± (0.1% reading ± 0.2ms)
Sampling rate of 20kHz
Storage mode Local storage
Dimensions: 340mm × 245mm × 210mm
Instrument weight: 7kg
III.Application Conditions
Ambient temperature -10 ℃ ~ 50 ℃
Ambient humidity ≤ 85% RH
Work Power AC220V±10%
Power frequency 50 ± 1Hz
Handling Instruction
Matters needing attention in operation:
Before use, the grounding terminal of the instrument must be connected with the ground wire.
During the test, it is not allowed to dismantle the test line.
For the on-load switch that has not been moved for a long time, the switch should be changed several times before the test to remove the oxide layer and impurities on the contact surface.



With our own rapid development and efficient operation, we have played an active role in promoting the Transformer on-Load Tap Changer Oltc Diagnosis Testing Equipment industry. The emergence of a large number of new technologies, new methods and new processes has accelerated the speed of product renewal and shortened the life cycle. We have plans and targets to provide various training and learning and growth opportunities for our employees, including professional skills for each position and general management skills.
Hot Tags: HZYA-2Z Digital Transformer On Load Switch Tap-Changer Analyzer, China, suppliers, manufacturers, price, for sale HZYA-2Z, oltc analyser, On Load Switch Tap-Changer Analyser, transformer testing equipment, 20kva voltage regulator, needle penetration tester, double storage oil filter, resonant hipot tester, Circuit Breaker Test Device
[[ProKeywords]]SPEC DATA
Send Inquiry
