+86-312-6775656
MCCB Primary Injection Circuit Test Procedure

MCCB Primary Injection Circuit Test Procedure

During the processing of the semi-finished products and the finished products in transformer production, the transformer newly installation before using, or according to IEC and national standard, the turns ratio or voltage ratio should be tested in the circle rate.
Send Inquiry
Product Details of MCCB Primary Injection Circuit Test Procedure

Product Introduction

We pursue excellence, not only have diversified business capabilities, but also uphold a pragmatic and steady work style to deliver the best quality tan delta test kit price, Sf6 Gas Leak test, 3 phase power quality analyzer price and services to our customers. Respecting, developing and perfecting talents are important parts of our sustainable development strategy. In order to meet the needs of customers, we advocate and implement standardized, fast, and value-added service concepts and awareness. We insist on analyzing the current industry market, forecasting the future market prospects and grasping the pulse of market development.

HZTTR80A Transformer Turn Ratio Tester


Panel Description

hzttr80a Turn Ratio Tester

1. Grounding Terminal: Before conducting any tests, please safely ground the grounding terminal to avoid the risk of electric shock.

2. Power Socket and Switch: The power input port for the entire device, used to connect or disconnect the test power supply.

3. High-voltage side connection terminals: There are three-color (yellow, green, red, and black, with the black one being counted as part of the color indication context here for understanding the connection mapping, though technically it's a single additional color column beyond the three primary phase colors) binding posts, corresponding to connection with the A, B, C, N phases of the high-voltage side of the transformer being measured.

4. Low-voltage side connection terminals: There are three-color (yellow, green, red, and black, similarly, the black one is included in the context for connection mapping explanation) binding posts, corresponding to connection with the a, b, c, n phases of the low-voltage side of the transformer being measured.

5. High-Voltage Side Terminals: Yellow, green, and red terminals for connecting to the A, B, and C phases of the high-voltage side of the transformer under test.

6. Low-Voltage Side Terminals: Yellow, green, and red terminals for connecting to the a, b, and c phases of the low-voltage side of the transformer under test.

7. RS232 Communication Interface: Interface for computer communication.

8. Printer: Prints test results.

9. USB: Connects to a USB flash drive for data export.

10. Display Screen: 7-inch high-definition color touchscreen LCD with adjustable backlight for displaying the operation menu and test results.


HZBB-10A Turn Ratio Tester

HZBB-10A Turn Ratio Tester


Technical Index

Test Range: Transformation Ratio -- 0.9 to 10000, Current -- 0 to 2000mA, Angle -- 0 to 360°

Ratio Accuracy:
5V Range: ±(0.1% + 2 digits) (0.9-50), ±(0.2% + 2 digits) (51-200), ±(0.5% + 2 digits) (201-600)
80V Range: ±(0.1% + 2 digits) (0.9-500), ±(0.2% + 2 digits) (501-2000), ±(0.5% + 2 digits) (2001-10000)
Current Accuracy: ±(1% of reading + 0.5 mA)
Angle Accuracy: ±0.2°
Output Voltage: Selectable 5V or 80V
Resolution: Ratio -- Minimum 0.0001, Current -- 0.001mA, Angle -- 0.01°
Test Voltage: AC 5V @ 1A, AC 80V @ 80mA
Operating Power Supply: The maximum power is 50W


Troubleshooting and Maintenance

If any abnormalities occur during the use of the tester, please follow the steps below for troubleshooting:

1. If the measurement data is abnormal, please check if the wiring is correct. If it is still abnormal, you can perform a self-test using the following method. The wiring is shown in the figure below:After connecting the wires, select any three-phase connection method for testing. If the measured value is approximately 1.0000, the instrument is functioning normally; otherwise, there is an issue with the instrument. If no shorting wire is available, you can also short-circuit the high-voltage side yellow, green, and red wire clamps to the corresponding low-voltage side yellow, green, and red wire clamps.

2. If the tester does not respond when turned on and the display screen is not lit, please check if the power fuse inside the panel is blown.

3. If it is confirmed to be an internal fault of the tester, please contact our company immediately, and we will resolve it as soon as possible.


hzbb10A ttr tester

Packing list


No.

Item

Qty

1

Host

1

2

Test Cables

1

3

Power Cord

1

4

Operation Manual

1

5

Certificate of Conformity

1

6

Fuse

2

7

Printing Paper

1

8

Packing List

1

9

Ground wire

1

HZTTR80A


lQDPKcrtGtmqmW_NAazNAyCw_iF2foFjEn0JNdw6T7ADAg_800_428

image014

image016

Request for quote_

Our business sticks for MCCB Primary Injection Circuit Test Procedure. The purpose of the enterprise is: to keep reputation, to respect contracts, and to provide high-quality, high-performance products. We also have stable cooperation with several international trading companies.

Hot Tags: HZTTR80A Three Phase Transformer Turn Ratio Tester, China, suppliers, manufacturers, price, for sale, 3 phase transformer turns ratio tester, digital transformer turns ratio tester, turns ratio test of a transformer, hzbb-10a three phase transformer turns ratio meter, hzbb10a, huazheng transformation ttr meter, transformer turn ratio test machine, turn ratio tester 250v, 3phase turn ratio tester, automatic variable ratio group tester, transformer ration test sets, ratio tester for power transformer, single phase turns ratio tester, surface tension measuring device, SF6 Gas Purity Test Set, 10a handheld dc resistance tester, non partial discharge testing transformer, SF6 Gas Purity Tester, vlf high voltage test

[[ProKeywords]]

SPEC DATA

Send Inquiry

Send a Message