+86-312-6775656
Laboratory Power Transformer Test Equipment Using Transformer Test Bench

Laboratory Power Transformer Test Equipment Using Transformer Test Bench

10000kVA/33KV electrical comprehensive transformer test bench System Introduction The whole test system adopts a combination of computer and PLC control methods. PLC is mainly used to set the logical relationship among various components, integrate and execute the underlying operation commands,...
Send Inquiry
Product Details of Laboratory Power Transformer Test Equipment Using Transformer Test Bench

Product Introduction

We are a technology-driven company focusing on promoting the update and upgrade of the CT PT Analyzer, series resonance withstanding voltage test, machine oil purifier. We abide by the tenet of honest management and establish a pre-sales and after-sales model oriented to meet customer needs. Our company establishes the public praise, creates the brand, expands the market positively, at present our business scope spreads over the world many countries.

10000kVA/33kV Electrical Comprehensive Transformer Test Bench

HZBZ-III transformer test bench

System Introduction

The whole test system adopts a combination of computer and PLC control methods. PLC is mainly used to set the logical relationship among various components, integrate and execute the underlying operation commands, and realize the basic protection functions of the system. It has flexible programming, high reliability, high-speed operation and other advantages, while the industrial control computer is mainly used for the organization of the test flow, the release of the action instructions, the realization of the system advanced protection functions, etc., Its communication with the PLC through RS-485 and completely isolated can effectively prevent the communication signal from being disturbed and ensure the safety of the computer when the test product fails to discharge to ground;

The test system adopts the way of frequency converter to realize the multi-speed adjustment of the speed of the lifting and lowering speeds in the performance test to achieve finer voltage and current adjustment levels and more accurate data sampling capabilities.


Technical Parameters

NO.

Equipment

Model

Quantity

01

Master station for transformer test bench


1

02

industrial control machine

IPC-610L

1

Display  screen

Samsung stereo screen 27 inches

1

Printer

HP

1

03

transformer test system software

V1.0

1

2,Test instrument

01

Turn ratio tester


1

02

power analyzer


1

03

Dual channel DC resistance tester


1

04

Insulation resistance tester


1

05

Transformer tan delta tester


1

06

Temperature inspector


1

3, High and low voltage control cabinet (containment structure, it can be hoisted as a whole, convenient and quick, internal wiring completed at once, saving installation and commissioning time).

01

Instrument integration unit one set


1

02

PLC control device


1

03

Test project distribution device

400A

1

04

High voltage current metering device


1

High voltage precision current Mutual inductor

400-200-100-50-20-10-5A/5A

Voltage level:22/√3KV

Precision grade:0.1

3

05

High voltage voltage metering devices


1

High voltage precision voltage Mutual inductor

(22.0-11.0-6.6-3.3)/√3/0.1KV

Voltage level:22/√3KV

Precision grade:0.1

3

4, Equipment

01

Three-phase induction voltage regulator

250KVA(10-650V)

1

02

Intermediate transformer

250KVA

1

03

Frequency doubling generator

10KV

1

5,Test transformer console

01

High voltage test transformer

50KVA/100KV

1

02

Test transformer console

50KVA(Including electric regulator)

1

03

Protection resistance

100KV

1

lightning impulse test system

01

Lightning impulse test system

450KV/20KJ(including 300KV chopper device)

1

Delivery time and other

Delivery date is 50 days, The delivery date shall be calculated from the date of payment.

Quality assurance

The supplier implements the product's lifetime warranty policy, one year's free warranty period in foreign countries, and the free warranty period starts at the date when the purchaser checks and accepts the complete set of equipment.

Comprehensive Transformer Test Bench (2)

Comprehensive Transformer Test Bench (3)

Comprehensive Transformer Test Bench (4)

Comprehensive Transformer Test Bench (1)

Precautions

1. The equipment demander only needs to provide three : power distribution cabinet with frequency 50Hz±0.1 and current not less than 500A;

2 The grounding resistance of the installation site shall not be greater than 0.5 ohms; in order to maintain the integrity of the site, it is better to pre-ditch the cable trench in the control room and equipment area during the civil construction;

3. Delivering the equipment should also provide detailed technical documents, instructions for use, electrical installation plans and related information;

4. The unfinished matters are negotiated and resolved by the two parties.

lQDPKcrtGtmqmW_NAazNAyCw_iF2foFjEn0JNdw6T7ADAg_800_428

image016

image018

Request for quote_

So that the Laboratory Power Transformer Test Equipment Using Transformer Test Bench continue to consolidate and expand the domestic market but also sells well abroad. The efficient integration of policy, technology, capital and other resources to achieve a win-win construction and development platform is of great significance to the modernization of the industry and the sustainable development of our company. Facing the future, we will focus on customer needs and value enhancement, lead by technological innovation, and continue to strive for development.

Hot Tags: 10000kVA/33kV Electrical Comprehensive Transformer Test Bench, China, suppliers, manufacturers, price, for sale, Transformer Test Bench Cost, Transformer Load Loss Test Bench, Desk Type Transformer Test Panel, Transformer Test Console, transformer characteristics test bed, multi functional integrated transformer test bench, Transformer comprehensive test station, transformer integrated measuring equipment, transformer test bench kit, transformers test benches, 35kv transformer test station, three phase transformer test bench, surface tension measuring device, tan delta test equipment, Ac Resonant Test Set, primary current injection test kit, sf6 dew point analyzer, transformer oil dissolve gas analysis

[[ProKeywords]]

SPEC DATA

Send Inquiry

Send a Message