
HZ4241 3 Phase Relay Protection Test Equipment
Huazheng Electric Manufacturing (Baoding) Co., Ltd. is one of the leading manufacturers and suppliers of hz4241 3 phase relay protection test equipment in China. Please feel free to buy high quality equipment for sale here from our factory. Good service and reasonable price are available.
Model HZ4241 3 Phase Relay Protection Test Equipment
AC current output
Phase current output (effective value) 0~40A, Output Precision 0.2 degree
3 phase parallel current output (effective value) 0~120A
Maximum output power of Phase current 450VA
Maximum output power of 3 parallel current 900VA
Maximum Permitted work time of 3 parallel current 10S
Frequency range ( fundamental) 20~1000Hz
DC current output
Current output 0~±10A / phase, 0~±30A / 3 parallel
AC voltage output
Phase voltage output (effective value) 0~120V Output Precision 0.2 degree
Line voltage output (effective value) 0~240V
Phase voltage / Line phase output power 80VA / 100VA
Frequency range (fundamental) 20~1000Hz
DC voltage output
Phase voltage output range 0~±160V Output Precision 0.5 degree
Line voltage output range 0~±320V
Phase voltage / Line phase output power 70VA / 140VA
General Rules For Use
Industrial control computer and Windows operating system have been set in this tester. Please do not switch on or off the power supply of host too frequently.
USB interfaces are allocated on the faceplate or backplate, which allow hot-swap USB equipment (such as flash disk, etc), but the drawing or inserting must be done after the data transmission has been completed.
In order to ensure that the Windows operating system built in the industrial control computer can run steadily, please do not delete or alter the documents in hardware and the logo on the desktop at will. Please do not operate, alter, increase, delete or use the built-in Windows system to avoid any damage on the operating system. When using the USB disk to copy data, please do ensure that the flash disk is clear without virus, and also please do not use the flash disk to set other software programs in this system.
When connecting outside keyboard or mouse, please do not connect wrong terminal; otherwise the Windows operating system won't be started up normally.
Please do not shut off power supply directly during outputting so as to avoid the wrong protection action due to incorrect output.
When switch quantity is compatible with both idle contact and the potential (0~DC250V) and uses charged contact, the high terminal (anode) of contact potential should be connected with the common end +KM.
Do not insert objects (e.g.screwdrivers,etc.) into the ventilation slots or any input/output sockets. When taking the tester into operation,make sure that the air slots,the power switch and the power supply plug at the test set remain unobstructed.The instrument should be laid uprightly, or unfold the bracket for slightly tilted placement
Do not lead external AC/DC power into the voltage and current output sockets of tester.
If the disturbance is stronger on the spot or high safety is required, before doing the test, please ground the outlet of power source or the protective earth of the tester.
If the interface data is wrong or you can not input correctly when using this tester, you can settle the problem as follows: delete the 'para' file under the 'E\Relay Protection Calibrator\, and then restart the running program, all data on the interface will be resumed to the default.
Procedures Of turning On/Off Tester
Procedures for turning on
Plug the power line of tester in AC220V outlet. If using external computer, please connect well the serial communication line with computer's serial interface and the communication interface on the bottom of the tester.
Checking the wires and ensuring the correct connection, switch on power supply of tester (if you would like to use external keyboard or mouse, please connect them with the tester before switching on the power supply, in this case, the tracking ball is invalid) and the power source of the external computer.A moment later, it will show you the 'Relay Protection Calibrator' software interface. On the main interface, click all kinds of functions testing module logo by using the left key of external connected mouse or tracking ball mouse for doing all tests.
Procedures for turning off
Please do not close down the power switch on the faceplate directly. You should terminate the Windows operating system firstly, and then press the power supply button when indication for safe turning off appears on the screen.
Move cursor on the main interface through mouse or press the 'QUIT' key on the faceplate to quit all functional testing units. After backing to the main interface, press the 'QUIT' key again, a dialog window for confirmation will be ejected on the screen. After your confirmation, you can turn off the power supply switch on the front panel when 'You can turn off the power supply now' appears on the screen, so the machine can be closed safely.
You can also turn off the device by choosing the 'start' menu of the operation system.
Company Introduction
HUAZHENG Electric Manufacturing (Baoding) Co., Ltd was established in 2008 and is located in Baoding City, Hebei Province, a famous historical and cultural city in China. Its main business is the production, manufacture and sales of electrical equipment and testing instruments.
Our company provides professional power equipment for the State Grid, municipal departments, power engineering companies, transformer factories, cable factories, laboratories, power testing service companies, substations, etc.
The company has strong technical force and advanced production equipment, and has a mature and professional international trade team, providing one-stop, all-weather services for global customers.



Hot Tags: hz4241 3 phase relay protection test equipment, China, suppliers, manufacturers, price, for sale, INTELLIGENT SECONDARY INJECTION RELAY TEST, secondary current injection relay tester, secondary current injection test kit, Single Phase Relay Test Equipment, secondary current injection box, Relay Test Set
Send Inquiry

