+86-312-6775656

Conditions and layout of high voltage laboratory

Aug 28, 2021

1

Laboratory layout

The area and height of the high-voltage test chamber shall meet the requirements of the corresponding permitted level of test activities.


2

Laboratory environmental conditions

Environmental facilities: In the high-voltage test room and around the test room, there must be no conductive and corrosive media in the atmosphere, and the temperature and relative humidity must meet the requirements of the relevant national and industry regulations and specifications.


Power supply: The power supply and lighting power supply of the laboratory should be set separately. The power supply capacity is designed to be 3 times the actual required capacity. For a three-phase four-wire power supply with a rated voltage of 380V, the power supply capacity shall not be less than the sum of the maximum power consumption of all low-voltage power supply equipment in the laboratory.


Test bench: corrosion resistance, wear resistance, fire resistance, high temperature resistance, waterproof, easy to clean.


Grounding grid: A grounding grid should be installed in the high-voltage test room, and the grounding resistance of the grounding grid should not exceed 0.5Ω. All metal structures and fixed metal safety shields (fences) in the test room should be firmly connected to the grounding grid. The grounding point should be clearly marked.


Safety protection: The high-pressure test room should maintain sufficient light, tight doors and windows, and complete ventilation facilities; there should be a passage that meets the requirements and clearly marked in the room. There should be fire-fighting passages around the test room, with no less than two exits, and ensure smooth flow. The standing position of the test bench should be covered with rubber insulation pads. Necessary isolation facilities should be set up to prevent the work of each section from affecting each other. It should be equipped with corresponding safety tools, anti-virus, anti-radiation, anti-scald protective equipment, explosion-proof and fire-fighting safety facilities, and emergency lighting power supply.


3

Test staff

The high-voltage test room should be equipped with test personnel who hold an electrician's network access operation permit (high-voltage test category). The test personnel should master the corresponding professional skills.


4

Laboratory management system

1. Laboratory safety system.

2. Equipment operation specifications.

3. Test project operation specification.

4. Test equipment management specifications.

5. Responsibilities of test personnel. 



Send Inquiry